RunTru Installation Scopes of Work
Air Conditioning with Furnace
Scope Of Work - AC / Furnace Vertical Install (Closet/Garage)
- Perform Home Engineering Analysis (Load Calculation) via Manual J guidelines to ensure proper equipment sizing.
- Protect home with floor covers.
- Remove & Replace existing split system with new AHRI rated split system with furnace/coil in closet or garage.
- Supply & Install new custom fabricated duct transition sealed to the flange of the coil to prevent air leaks.
- Supply & Install new p-trap. (as needed)
- Supply & Install new vent for furnace exhaust to existing roof penetration.
- Supply & Install heavy-duty electrical cord or service disconnect for the furnace.
- Supply & Install gas distribution assembly, with drip leg & flexible gas line & shut off for furnace.
- Supply & Install a basic programmable thermostat.
- Supply & Install new condenser pad.
- Supply & Install new service disconnect & electrical feeder from disconnect to system.
- Flush existing line set to remove debris and mineral oil in preparation for R410a refrigerant.
- Purge nitrogen through refrigerant tubing while brazing connections to prevent carbon build up.
- Evacuate system/lineset and achieve a standing vacuum below 500 microns.
- Re-insulate refrigerant lines outside and in closet/garage where applicable.
- Startup and charge AC equipment according to manufacturer’s specifications to attain rated efficiency.
- Flush and Test Condensate line to ensure drains are free of debris
- Remove all waste from interior of home & vacuum floors.
- Haul away & recycling of existing equipment per E.P.A. guidelines.
- Post installation system inspection forms to be emailed to customer
- Register equipment to activate extended warranties.
- Final site visit by Install Manager for performance and quality review.
Scope Of Work - AC / Furnace Horizontal Install (Attic)
- Perform Home Engineering Analysis (Load Calculation) via Manual J guidelines to ensure proper equipment sizing.
- Protect home with floor covers and drape plastic in closets and pantries as needed.
- Remove & Replace existing split system with new AHRI rated split system with furnace/coil in attic.
- Supply & Install custom uni-strut hangers to support system & drain pan.
- Supply & Install new Goliath Dexelar secondary drip pan with vibration isolators.
- Supply & Install new custom fabricated duct distribution boxes (plenums) matched & sealed to the flange of the coil & furnace to prevent air leaks.
- Supply & Install new p-trap (as needed).
- Supply & Install water sensor in secondary pan.
- Supply & Install new B-vent for furnace exhaust to existing roof penetration.
- Supply & Install heavy-duty electrical cord or service disconnect for furnace.
- Supply & Install gas distribution assembly, with drip leg & flexible gas line & shut off for furnace.
- Supply & Install basic programmable thermostat.
- Supply & Install new condenser pad.
- Supply & Install new service disconnect & electrical feeder from disconnect to system.
- Flush existing line set to remove debris and mineral oil in preparation for R410a refrigerant.
- Purge nitrogen through refrigerant tubing while brazing connections to prevent carbon build up.
- Evacuate system/line-set and achieve a standing vacuum below 500 microns.
- Re-insulate refrigerant lines outside and in attic where applicable.
- Startup and charge AC equipment according to manufacturer’s specifications to attain rated efficiency.
- Flush and Test Condensate line to ensure drains are free of debris
- Rebuild/replace attic access trim. (As needed)
- Remove all waste from interior of home & vacuum floors.
- Haul away & recycling of existing equipment per E.P.A. guidelines.
- Post installation system inspection forms to be emailed to customer
- Register equipment to activate extended warranties.
- Final site visit by Install Manager for performance and quality review.
Split Heat Pump with Air Handler
Scope Of Work - Split Heat Pump Vertical Install (Closet/Garage)
- Perform Home Engineering Analysis (Load Calculation) via Manual J guidelines to ensure proper equipment sizing.
- Protect home with floor covers.
- Remove & Replace existing split system with new AHRI rated split system with air handler in closet or garage.
- Supply & Install new custom fabricated duct transition sealed to the flange of the air handler to prevent air leaks.
- Supply & Install new condensate p-trap. (As Needed)
- Supply & Install heavy-duty electrical cord or service disconnect for air handler.
- Supply & Install new basic programmable thermostat.
- Supply & Install new heat pump pad.
- Supply & Install new service disconnect & electrical feeder from disconnect to system.
- Flush existing line set to remove debris and mineral oil in preparation for R410a refrigerant.
- Purge nitrogen through refrigerant tubing while brazing connections to prevent carbon build up.
- Evacuate system/lineset and achieve a standing vacuum below 500 microns.
- Re-insulate refrigerant lines outside and in closet/garage where applicable.
- Startup and charge heat pump equipment according to manufacturer’s specifications to attain rated efficiency.
- Flush and Test Condensate line to ensure drains are free of debris
- Remove all waste from interior of home & vacuum floors.
- Haul away & recycling of existing equipment per E.P.A. guidelines.
- Post installation system inspection forms to be emailed to customer
- Register equipment to activate extended warranties.
- Final site visit by Install Manager for performance and quality review.
Scope Of Work - Split Heat Pump Horizontal Install (Attic)
- Perform Home Engineering Analysis (Load Calculation) via Manual J guidelines to ensure proper equipment sizing.
- Protect home with floor covers and drape plastic in closets and pantries as needed.
- Remove & Replace existing split system with new AHRI rated split system with air handler in attic.
- Supply & Install custom uni-strut hangers to support system/drain pan.
- Supply & Install new Goliath Dexelar secondary drip pan with vibration isolators.
- Supply & Install new custom fabricated duct distribution boxes (plenums) matched & sealed to the flange of the air handler to prevent air leaks.
- Supply & Install new condensate p-trap. (As Needed)
- Supply & Install water sensor in secondary pan.
- Supply & Install heavy-duty electrical cord or service disconnect for air handler.
- Supply & Install basic programmable thermostat.
- Supply & Install new heat pump pad.
- Supply & Install new service disconnect & electrical feeder from disconnect to system.
- Flush existing line set to remove debris and mineral oil in preparation for R410a refrigerant.
- Purge nitrogen through refrigerant tubing while brazing connections to prevent carbon build up.
- Evacuate system/lineset and achieve a standing vacuum below 500 microns.
- Re-insulate refrigerant lines outside and in attic where applicable.
- Startup and charge heat pump equipment according to manufacturer’s specifications to attain rated efficiency.
- Flush and Test Condensate line to ensure drains are free of debris
- Rebuild/replace attic access trim. (As needed)
- Remove all waste from interior of home & vacuum floors.
- Haul away & recycling of existing equipment per E.P.A. guidelines.
- Post installation system inspection forms to be emailed to customer
- Register equipment to activate extended warranties.
- Final site visit by Install Manager for performance and quality review.
Package Heat Pump
Scope of Work
- Remove & Replace existing package heat pump system with new AHRI rated package heat pump system.
- Crane Included for Installation.
- Supply & Install new service disconnect & electrical whip at unit.
- Supply & Install insulated elbow.
- Supply & Install painted angle iron stand.
- Supply & Install a basic programmable thermostat.
- Supply & Install new primary drain p-trap and test for proper operation.
- Perform Home Engineering Analysis (Load Calculation) via Manual J to ensure proper equipment sizing.
- Disposal and haul away of existing equipment per E.P.A. guidelines.
- Register equipment to activate extended warranties.
- Final site visit by Install Manager for performance and quality review.